|
|  |
A mock-up of the first stage of South Korea's new rocket arrives to South Korea for Testing at Naro
09.08.2008
At Naro Space Center, Russian and Korean specialists will carry out a number of tests, the goal of which is the trial of ground technological equipment and the launch pad.
These efforts are covered by the bi-lateral inter-governmental agreement on space exploration between Russia and S.Korea signed in October 2004. The agreement calls for joint development of the S.Korean space launcher complex including the KSLV-I small-lift booster. KSLV-I Stage 1 will be developed by the Khrunichev Space Center while Stage 2 and payload will be designed and built in S.Korea.
The S.Korean customer is the Korea Aerospace Research Institute (KARI). The Russian side is represented by the Khrunichev Space Center which has overall responsibility for the project, NPO Energomash (Stage 1 propulsion system) and KBTM which designs the ground facilities.

Latest News:
|
 |
|
|
 |
 |
News Releases
Proton M with Intelsat-16 Satellite On Launch Pad 08.02.2010 The roll out of the Proton Breeze M launch vehicle, fully integrated with the Intelsat-16 satellite and Breeze M upper stage, to launch pad 39 (in Area 200) was completed this morning. The Proton Breeze M launch vehicle with the Intelsat-16 communications satellite is to lift off Baikonur Cosmodrome at 06:39 Baikonur Time, February 12.
Intelsat 16 Spacecraft Integrated With Proton M Rocket 04.02.2010 At Baikonur, operations for Intelsat-16 launch continue on schedule.
Yesterday,the fully assembled Ascent Unit (made of the Intelsat 16 spacecraft, adapter, Breeze M upper stage and payload fairing) was integrated with the Proton launch vehicle.
The Intelsat -16 In Preparation For Launch: Photo–Reportage02.02.2010 In Processing Hall 101 of Baikonur's Assembly and Testing Building 92-A50, over the last few days the launch team has been working to assemble the Proton Ascent Unit (the Intelsat-16 spacecraft, payload adapter, Breeze M upper stage and fairing). The fully assembled AU is currently undergoing final checks.
|  |
|
 |
|
|
|